Find jobs easy, with EZ Jobs!
Download App

Assistant Manager(Chemical)

TK10000-15000Per month
Posted on 07/Jan/2026 12:17

Job Info

  • save iconsave iconSave
  • share iconshare iconShare
  • report iconreport iconreport
Job Details
  • time iconFull Time
  • pay iconPer month
  • vacancies icon1 of vacancies
Name of the Project: Patuakhali 1320 (2x660) MW Coal Fired Thermal Power Plant Project Location: Mouza: Dhankhali, Nishanbaria, Londa; Union: Dhankhali; Upazilla: Kalapara; District: Patuakhali. Capacity: 1320 (2x660) MW Project Cost: USD 2.54 Billion Debt : Equity: 70:30 Required Land: 500 acres Type of the Power Plant: Ultra Supercritical Cooling System: Closed Cycle (Cooling Tower) Source of Water: Rabnabad Channel Mechanism: Low Nox Burner, Electro Static Precipitator (ESP), Flue Gas, De-Sulfurization (FGD), Induced draft Cooling Tower. Power Evacuation: At 400 KV level to the National Grid Fuel Type: Imported Coal (from Indonesia & Australia) Coal Requirement: 12273 tons (daily); 4 Million tons (yearly) Commercial Operation: August, 2023 (1st Unit 660 MW) Date (As per PPA): December, 2023 (2nd Unit 660 MW) Power Purchaser: Bangladesh Power Development Board (BPDB)
Job Requirements
Experience years
  • ALL

About Recruiter

RPCL-NORINCO INTL POWER LIMITED (RNPL)
Assistant Manager(Chemical)
Posted on 07/Jan/2026 12:17
RPCL-NORINCO INTL POWER LIMITED (RNPL)
  • Job Info
  • About Recruiter
Job Details
  • time iconFull Time
  • pay iconPer month
  • vacancies icon1 of vacancies
Name of the Project: Patuakhali 1320 (2x660) MW Coal Fired Thermal Power Plant Project Location: Mouza: Dhankhali, Nishanbaria, Londa; Union: Dhankhali; Upazilla: Kalapara; District: Patuakhali. Capacity: 1320 (2x660) MW Project Cost: USD 2.54 Billion Debt : Equity: 70:30 Required Land: 500 acres Type of the Power Plant: Ultra Supercritical Cooling System: Closed Cycle (Cooling Tower) Source of Water: Rabnabad Channel Mechanism: Low Nox Burner, Electro Static Precipitator (ESP), Flue Gas, De-Sulfurization (FGD), Induced draft Cooling Tower. Power Evacuation: At 400 KV level to the National Grid Fuel Type: Imported Coal (from Indonesia & Australia) Coal Requirement: 12273 tons (daily); 4 Million tons (yearly) Commercial Operation: August, 2023 (1st Unit 660 MW) Date (As per PPA): December, 2023 (2nd Unit 660 MW) Power Purchaser: Bangladesh Power Development Board (BPDB)
Job Requirements
Experience years
  • ALL
RPCL-NORINCO INTL POWER LIMITED (RNPL)
  • tip icon
    Risk Reminder
Not satisfied with the current position? Complaintright icon